{"id":1968,"date":"2016-11-30T13:00:40","date_gmt":"2016-11-30T13:00:40","guid":{"rendered":"https:\/\/hpc.grnet.gr\/en\/coming-soon-2\/progress-reports\/"},"modified":"2026-06-13T08:24:21","modified_gmt":"2026-06-13T08:24:21","slug":"progress-reports","status":"publish","type":"page","link":"https:\/\/www.hpc.grnet.gr\/en\/access-2\/progress-reports\/","title":{"rendered":"Progress Reports"},"content":{"rendered":"<p class=\"p1\">At the end of each project, whether production, preparation, or development, in the ARIS system, a project report is required.<\/p>\n<ul class=\"ul1\">\n<li class=\"li1\"><b>Production<\/b> projects: the report must be submitted to GRNET no later than two (2) months after project completion. The report must be written using the template available <a href=\"http:\/\/www.hpc.grnet.gr\/wp-content\/uploads\/2023\/02\/hpc-grnet.gr-Final-Report_Production_Project_Access_v1.doc\"><span class=\"s1\">here<\/span><\/a>.<\/li>\n<li class=\"li1\"><b>Preparation\/development<\/b> projects: the report must be submitted to GRNET no later than one (1) month after project completion. The report must be written using the template available <a href=\"http:\/\/www.hpc.grnet.gr\/wp-content\/uploads\/2023\/02\/hpc.grnet_.gr-Final-Report-Preparatory-Development-v1-PROJECT_NAME.doc\"><span class=\"s1\">here<\/span><\/a>.<\/li>\n<\/ul>\n<p class=\"p1\">Please adhere to the above deadlines. Submission of reports is mandatory. Failure to submit a report within the specified period may be taken into account negatively in future evaluations.<\/p>\n<p class=\"p1\">Reports are sent by email to <span class=\"s2\">hpc-access at lists.grnet.gr<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>At the end of each project, whether production, preparation, or development, in the ARIS system, a project report is required. Production projects: the report must be submitted to GRNET no later than two (2) months after project completion. The report must be written using the template available here. Preparation\/development projects: the report must be submitted [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":35,"menu_order":0,"comment_status":"closed","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-1968","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.hpc.grnet.gr\/en\/wp-json\/wp\/v2\/pages\/1968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hpc.grnet.gr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.hpc.grnet.gr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.hpc.grnet.gr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hpc.grnet.gr\/en\/wp-json\/wp\/v2\/comments?post=1968"}],"version-history":[{"count":4,"href":"https:\/\/www.hpc.grnet.gr\/en\/wp-json\/wp\/v2\/pages\/1968\/revisions"}],"predecessor-version":[{"id":5210,"href":"https:\/\/www.hpc.grnet.gr\/en\/wp-json\/wp\/v2\/pages\/1968\/revisions\/5210"}],"up":[{"embeddable":true,"href":"https:\/\/www.hpc.grnet.gr\/en\/wp-json\/wp\/v2\/pages\/35"}],"wp:attachment":[{"href":"https:\/\/www.hpc.grnet.gr\/en\/wp-json\/wp\/v2\/media?parent=1968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}